1
/
of
1
Free SVG
Cables and Sensors BP09 NIBP Connector Lead Time_2-3 Weeks 2500 PKG: Package (includes Printer MMK-6218-001-801
Cables and Sensors BP09 NIBP Connector Lead Time_2-3 Weeks 2500 PKG: Package (includes Printer MMK-6218-001-801
$11.75 USD
Shipping calculated at checkout.
Couldn't load pickup availability
Cables and Sensors BP09 NIBP Connector Lead Time_2 3 Weeks 2500 PKG: Package (includes Printer MMK 6218 001 801 2500 PKG: Package (includes Printer and OTO CHEK) Usage: Calf garments inflate at a pressure of 40 mmHg with a cycle time of 12 seconds inflation and 48 seconds deflate Latex free Cables and Sensors BP09 NIBP Connector Specifications